Construction guide ยท Roof
Roof waterproofing and heat insulation in Lahore
Lahore roofs face 45ยฐC+ summers and monsoon rain. Leaks and heat are cheaper to stop at construction than to repair.
Waterproofing basics
- Proper slope (about 1:100 or more) towards drains.
- A membrane or coating layer, lapped up the parapet walls.
- Water test (ponding) for 24โ48 hours before tiles.
- Rainwater outlets with gratings, sized for heavy monsoon rain.
Heat insulation
- Insulation boards (e.g. XPS/EPS) above the slab, under the screed and tiles.
- Light-coloured reflective top finish.
- Insulation reduces AC load noticeably on top floors.
Send your plot size, location and photos on WhatsApp for a written estimate, or try the construction cost calculator.
Frequently asked questions
When should roof waterproofing be done?
After the slab cures and services are fixed, before the final tiles, with a water test.
Does roof insulation reduce electricity bills?
Yes, it lowers heat gain on the top floor, which reduces AC running time.
๐ House plans & naqsha designsConstruction Cost per Sq Ft in Lahore 2026 โ3 Marla House Naqsha and Construction Cost in Lahore โ7 Marla House Naqsha and Construction Cost in Lahore โ10 Marla House Naqsha and Construction Cost in Lahore โ1 Kanal House Naqsha and Construction Cost in Lahore โHouse Construction in Gulberg, Lahore โHouse Construction in Johar Town, Lahore โRemote Construction Supervision for Overseas Pakistanis โInterior Design Cost in Lahore โHome Maintenance and Facility Management in Lahore โ๐งฎ Cost calculatorConstruction โCost per marla โ5, 10 marla & 1 kanal cost โOverseas builder checklist โRenovation cost โMap approval โBasement & boundary wall โInterior & kitchen cost โProperty care from abroad โGrey vs finishing โRates per sq ft โTurnkey construction โBuild from abroad โRemote site monitoring โChoosing a builder โConstruction stages โContract checklist โBuild from UK/USA/Canada โRenovate from abroad โ
Rates are typical November 2026 ranges for Lahore and change with steel, cement and labour prices. Ask us for an itemised quote for your plot.