Construction guide
House construction contract checklist for Lahore
Most construction disputes in Lahore start with a short or verbal agreement. A clear written contract does not need legal jargon; it needs the right details. Use this checklist before you sign with any builder, and have your own lawyer review the final document.
What the contract should contain
- Exact scope: grey structure only, finishing, or turnkey.
- Drawings and a written specification with material grades and brands.
- Total price, how covered area is measured, and what is excluded.
- Stage-wise payment schedule.
- Start date, stage timeline and what happens if work is delayed.
- How changes (variations) are priced and approved in writing.
- Who handles approvals, utility connections and site safety.
- Handover, snag list and any defect period the builder offers.
Frequently asked questions
What should a house construction contract in Pakistan include?
Scope, drawings and specification, price and exclusions, stage payments, timeline, how changes are handled, responsibilities and handover terms.
Is a verbal agreement with a contractor enough?
No. Always sign a written agreement and keep copies of drawings, quotes and payment receipts.
๐งฎ Cost calculatorConstruction โCost per marla โ5, 10 marla & 1 kanal cost โOverseas builder checklist โRenovation cost โMap approval โBasement & boundary wall โInterior & kitchen cost โProperty care from abroad โGrey vs finishing โRates per sq ft โTurnkey construction โBuild from abroad โRemote site monitoring โChoosing a builder โGrey structure cost โConstruction stages โBuild from UK/USA/Canada โRenovate from abroad โ
Rates are typical November 2026 ranges for Lahore and change with steel, cement and labour prices. Ask us for an itemised quote for your plot.